No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. ADI CIPTA - 01.513.807.6-911.000 | 100,0 | 97,31 | Rp. 248.586.000,00 |
Rp. 248.586.000,00 |
||||||||
2 | PT. GUMI ADIMIRA - 01.475.285.1-911.000 | 61,17 | |
|
Tidak mengupload dokumen/file penawaran | ||||||||
3 | CV. ASRID BINA UTAMA - 01.884.093.4-911.000 | 23,84 | |
|
Tidak mengupload dokumen/file penawaran | ||||||||
4 | PT. MITRA CIPTA ENGINEERING - 74.628.131.0-615.000 | |
|
||||||||||
5 | CV. SIBINUANG - 76.626.639.9-911.000 | |
|
||||||||||
6 | CV. RANGGA MECI - 76.075.608.0-913.000 | |
|
||||||||||
7 | CV. ANUGERAH MAJU BERSAMA - 31.582.251.0-915.000 | |
|
||||||||||
8 | PT. ARIA JASA REKSATAMA - 01.203.046.6-609.000 | |
|
||||||||||
9 | CV. DARMA CITRA UTAMA - 01.562.420.8-805.000 | |
|
||||||||||
10 | CV. MITRA ACADEMIA ENGINEERING - 02.454.202.9-615.000 | |
|
||||||||||
11 | PT TOTAL CIPTA PERSADA - 03.329.922.3-606.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak